Focus on Efficiency and Precision
Sampmax’s steel formwork solutions were selected to streamline the construction process for the project’s multi-story buildings.

Cost Efficiency
Time Savings
Sampmax’s steel formwork allowed for a 30% reduction in material costs compared to traditional systems. The fast assembly and reusability of the formwork system resulted in 15% faster completion times for slab and wall construction, enhancing overall project timelines.

Durability and Reusability
100 times use
The steel formwork can be reused up to 100 times, significantly reducing waste and material consumption over the course of the project.

Quality Finishes
Enhanced productivity
The precision and smooth surface achieved through Sampmax’s formwork systems resulted in minimal finishing work required, improving the overall quality and reducing post-construction costs.

Residential Project in Dubai
Housing, Villa, any residential project will have perfect soltution to setup.

Related Projects
-
Residential, DubaiLEARN MORE >Located in the heart of Dubai, this residential development project features state-of-the-art construction using Sampmax’s high-quality steel formwork systems
CONTACT SALES
Please complete the form and our expert will contact you soon.
-Find the right solution
-Get instant pricing or request a quote
-Become a partner
-Ask for information